China's Leading Beverage Bottling Equipment Manufacturer

ShenZhen J&D Drinking Water Equipment Co., Ltd.

ZhangJiaGang  J&D  Packing  Machinery  Co.,  Ltd.

 

 +86-0755-88321071

 +86-13823281855

Mountain spring production equipment installation considerations

by:J&D WATER     2020-03-11
Mountain spring production equipment installation note 1, please do not close to the fire, and any heating element. 2, mountain spring production equipment installation site should level off, clean and tidy environment, close to the power supply, water supply. 3, in the north mountain spring production equipment shall not be installed outdoor, in case of frozen inside the equipment damage meter and filter element. 4, mountain spring production equipment installation position should be able to facilitate drainage, keep equipment drain smoothly. 1) When the water pressure & lt; 0. 12Mpa。 Traffic & lt; 3. 0 t/H, the machine will be repeated in the operation of the multi-stage pump starts - - - - - - - - - - - - - Stop - - - - - - - - - - - - - The phenomenon of starting. Then the machine will stop using, to prevent burning motor, hydraulic pressure and flow rate is insufficient, please increase the original water tank in front of the mountain spring production equipment. 2) System used in the water pump working pressure to ensure in 1. 0 - 1. 2 mpa, ensure the pump work within the scope of its rated head. All the above is to introduce the content, hope to be of help. If you want to learn more knowledge, you can visit our website, we will provide you with more professional information.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...