China's Leading Beverage Bottling Equipment Manufacturer

ShenZhen J&D Drinking Water Equipment Co., Ltd.

ZhangJiaGang  J&D  Packing  Machinery  Co.,  Ltd.

 

 +86-0755-88321071

 +86-13823281855

Specification for our city rainwater recycling system construction

by:J&D WATER     2020-03-06
In our city rainwater recycling system construction specification to inform the relevant units, the guangdong province water conservation ordinance, the 'regulations on the administration of urban and rural water supply in guangdong province' and 'dongguan city water supply and water conservation management regulations such as regulations, & other; Planning land area of twenty thousand square meters of new buildings should build supporting rainwater recycling system, rainwater collection system & throughout; &ldquo仍然; Use of urban and rural water supply of the building, rebuilding and expansion projects, shall build supporting water conservation facilities. Water-saving facilities shall be with the principal part of engineering design, construction, simultaneously also use & throughout; 。 In order to further promote the city rainwater recycling system, rainwater collection work, enhance the level of rainwater utilization and promoting water saving and emissions reduction, coordinated pushing forward the construction of the sponge city now notice is as follows: one, the planning and construction land area of twenty thousand square meters of new buildings, must form a complete set of construction rainwater recycling system, rainwater collection system, its form a complete set of standards for: per land area of ten thousand square meters planning, PeiJian rainwater recycling system, rainwater collection facilities, the effective volume of not less than 100 cubic meters. Qualified, can use natural depression, ponds, natural water bodies and other PeiJian ecotype to regulate use of facilities. Second, the need to build supporting rainwater recycling system, rainwater collection facilities of construction projects, the rainwater recycling system, rainwater collection project, shall be at the same time with the main part designed, constructed and put into use at the same time. Without acceptance or acceptance is unqualified, shall not be delivered. Third, the residential area or unit, conditional using rainwater or reclaimed water, its inside of greening, landscaping, sanitation, water may not be directly using municipal tap water. Four, rainwater recycling system using the design of the project, the comprehensive utilization of rainwater in dongguan shall conform to the technical guidance ( Trial) 'The relevant requirements. Five, dongguan city water supply water saving management office will continue to carry out the construction of rainwater recycling system, rainwater collection system of the special law enforcement action, for planning land area of twenty thousand square meters of construction of new buildings did not form a complete set of rainwater recycling system, rainwater collection system of illegal ACTS, will be investigated in accordance with the law. Six, conform to the statutory conditions, need to build the rainwater recycling system, rainwater collection system of the construction unit, should take the initiative to declare the project basic situation, fill in 'dongguan city rainwater utilization project basic information registration form'.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...