China's Leading Beverage Bottling Equipment Manufacturer

ShenZhen J&D Drinking Water Equipment Co., Ltd.

ZhangJiaGang  J&D  Packing  Machinery  Co.,  Ltd.

 

 +86-0755-88321071

 +86-13823281855

Winter cans of filling machine maintenance steps

by:J&D WATER     2020-03-11
Winter in beverage filling machine maintenance overhaul: step 1, appearance frame integrity check, traces of corrosion after processing, hinges for damage; Pipeline cleaning, container cleaning, clean float liquid level gauge, platform cleaning, cleaning chain. 2, filling head maintenance: in-line to baode valve plug; Piston filler plug for internal wall ( If stainless steel round mouth damage also can make the seal is lax, hurt also want to pay attention to whether or not round mouth when the damaged) ; After the cylinder cleaning, check to see if the spring shape, special smooth drip into the cylinder. 3, the 3-way valve (pos. No. Maintenance: three-way valve sealing ring; After the cylinder cleaning, check to see if the spring shape, special smooth drip into the cylinder. 4, four fluorine tube: clip to replace with corrosion, ptfe tube leakage material to replace. 5, such as pieces of screws: corrosion for replacement, fixed screw knife block, knife cylinder block split detergent, fixed tray cleaning, liquid pipe installation with clip lock. 6, electrical wiring, neat and beautiful, to replace solenoid valve, the measurement unstable contact check whether the wire connection is good, good insulation, to check whether there is flow marks, contactor appearance check float liquid level gauge screw loosening and movement range is correct. All the above is to introduce the content, hope to be of help. If you want to learn more knowledge, you can visit our website, we will provide you with more professional information.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...